Commercial Office Complex
John Handcock Realty. Project was installed so that cooperate, and local residents would access to a sustainable walking path through the wooded coastline of the Charles River.
Install a 1 mile ( half mile loop ) walking / running trail along the Charles River. Porous Pave XL was installed over a 12” clean stone base to prevent storm water surge from flooding into the Charles River during heavy Rain Events.